Hello,
I'm trying to run a EFIELD_PEAD calculation on a rather large system. Turns out that the maximum allocatable CPU-time on the cluster I'm using is just sufficient for the first two
calls to the ELMIN_ALL routine, but not for the third one, so the run crashes, and I have to start over. Is there a way to save the relevant results of those successful calls, and restart the next run using these saved values? In that way it may be possible to finish the calculation in the allocated time.
It would be OK if this involves some coding, but I'd probably need some guiding.
Thanks,
Heribert
Restart a EFIELD_PEAD calculation
Moderators: Global Moderator, Moderator
-
- Newbie
- Posts: 1
- Joined: Wed Jan 23, 2013 7:22 pm
Restart a EFIELD_PEAD calculation
Last edited by hreis on Tue Feb 05, 2013 10:52 pm, edited 1 time in total.
-
- Global Moderator
- Posts: 1817
- Joined: Mon Nov 18, 2019 11:00 am
Re: Restart a EFIELD_PEAD calculation
Hi,
We're sorry that we didn’t answer your question. This does not live up to the quality of support that we aim to provide. The team has since expanded. If we can still help with your problem, please ask again in a new post, linking to this one, and we will answer as quickly as possible.
Best wishes,
VASP